Awaab's Law, damp and mould: what landlords must do and by when
Awaab's Law sets fixed times to investigate and fix damp, mould and other serious hazards. It has applied to social housing since 27 October 2025. The Renters' Rights Act lets the government extend it to private lets; it is in consultation until 18 December 2026; no start date has been set. Until then your existing repair and fitness duties still bite.
In short: Not yet for private lets, but the clock has started. Awaab's Law has applied to social landlords since 27 October 2025: emergency hazards made safe within 24 hours, a significant hazard such as damp and mould investigated within 10 working days, the findings in writing within 3 working days, and the home made safe within 5 working days. Section 60 of the Renters' Rights Act 2025 lets the government apply the same to private tenancies; the consultation (9 October to 18 December 2026) proposes the same timescales; no start date has been set. Today a private landlord still owes the fitness-for-habitation and repair duties of the Landlord and Tenant Act 1985, which a tenant can enforce in court, and the council can act under the housing health and safety rating system.
Repairs and standardsSafety certificates and the homeThe Renters’ Rights Act
England. Checked against the law on 30 October 2026. Information, not legal advice.
Where Awaab's Law stands today
Social housing: in force. Since 27 October 2025 registered providers of social housing must act within fixed times on damp and mould and on every emergency hazard (phase 1). Phase 2, from 30 November 2026, adds excess cold and heat, falls, electrical hazards, fire, structural collapse and hygiene hazards. Phase 3, in 2027, adds the remaining hazards of the housing health and safety rating system (HHSRS), except overcrowding.
Private lets: not yet. Section 60 of the Renters' Rights Act 2025 rewrites section 10A of the Landlord and Tenant Act 1985 so that it can apply to a tenancy of a home in England of under seven years. That section is not in force yet, and the timescales come in regulations that have not been made. The government's consultation, Extending Awaab's Law to private rented tenancies and to licences, opened on 9 October 2026 and closes at 11:59pm on 18 December 2026. No start date has been set. It asks whether to bring it in by phases (damp, mould and emergency hazards first, as in social housing). Its impact assessment assumes three phases in 2028, 2029 and 2030; that is an analytical assumption, not a decision.
So: nothing new is required of a private landlord today, and no start date is set. What follows is what is proposed, so you can get ready, and what you already owe.
The timescales proposed for private lets
The consultation proposes the same clock as social housing, counted from the day you become aware of a potential hazard (that day is day zero):
| Step | Proposed time |
|---|---|
| An emergency hazard (a serious and imminent risk): investigate and make safe | as soon as practicable, and within 24 hours |
| Investigate a significant hazard such as damp and mould | within 10 working days |
| Give the tenant a written summary of what you found and what you will do | within 3 working days of the investigation ending (not needed if all the work is already done) |
| Make the hazard safe (temporary measures count) | within 5 working days of the investigation ending |
| Start preventative or longer works | within 5 working days, or take steps to start and begin within 12 weeks |
| Alternative accommodation if the home cannot be made safe in time | asked about, not proposed firmly (the social-housing rule requires it) |
The consultation also asks whether some of these should be shorter or longer (for example 12 or 48 hours for an emergency, 5 or 15 working days to investigate). Expect the final figures to be close to the table.
How it would be enforced
Awaab's Law works as an implied term of the tenancy. If a landlord misses a deadline the tenant can sue for breach of contract: a court can order the work, award compensation and some costs. The Pre-Action Protocol for Housing Conditions Claims applies first. Tenants would also be able to complain to the Private Rented Sector Landlord Ombudsman, which is expected from 2028 and can order action, an apology or compensation. Councils do not police the timescales themselves, but keep their HHSRS powers (improvement notices and the penalties behind them).
A landlord who uses an agent stays liable: the consultation says agency contracts may need to say who does what within the deadlines.
What a private landlord already owes
Awaab's Law is new; the duty to deal with damp and mould is not.
- Fit for human habitation (Landlord and Tenant Act 1985, section 9A, from the Homes (Fitness for Human Habitation) Act 2018): the home must be fit at the start of the tenancy and stay fit. Damp, mould, cold and ventilation problems can make it unfit. The tenant can go to court for an order and compensation.
- Repairs (section 11): the structure and exterior, and the installations for water, gas, electricity, sanitation, heating and hot water, are yours to keep in repair. Leaks, failed extractor fans and broken heating are repair duties, whatever the cause of the mould.
- The council's HHSRS powers (Housing Act 2004): damp and mould is a hazard the council can inspect for and serve an improvement notice on; not complying is an offence with a civil penalty of up to £40,000 or prosecution, and a rent repayment order.
- The Decent Homes Standard for private lets is coming under the Renters' Rights Act, with its own timing set by regulations after consultation.
Getting ready
- Answer every report in writing, with a date. Keep the tenant's message, your reply and photos on the home's record. The written summary within three working days is the step most landlords will miss.
- Inspect within ten working days, even for a small patch: a damp meter, the extractor fans, the trickle vents, the heating, any leak, and whether the mould is on a cold outside wall.
- Fix the cause, not only the stain. Condensation needs heating, ventilation and sometimes insulation; penetrating damp needs the gutter, roof or pointing; rising damp needs a survey. Advice to the tenant about drying clothes and opening windows can be part of the answer, never the whole of it.
- Have someone who can attend within 24 hours for an emergency: a leak through a light fitting, no heating in winter for a vulnerable tenant, a collapsing ceiling.
- Know when the home cannot be lived in and what you would offer: the social-housing rule is alternative accommodation, and the consultation asks whether private landlords should have the same duty.
LevelMoves keeps the report, your written reply, the inspection and the fix on the home's record, so the dates are there if anyone asks.
Scotland and Wales
This guide is about England. Scotland has made its own damp and mould regulations under its housing law; Wales has its own fitness standard. If you let there, check the rules that apply there.
Where this comes from
- GOV.UK: Extending Awaab's Law to private rented tenancies and to licences (consultation, 9 October to 18 December 2026)
- GOV.UK: Awaab's Law, consultation on timescales for repairs in the social rented sector, government response
- legislation.gov.uk: Renters' Rights Act 2025, section 60
- legislation.gov.uk: Landlord and Tenant Act 1985, sections 9A to 11
- GOV.UK: Guide to the Renters' Rights Act
Questions landlords ask
Does Awaab's Law apply to private landlords now?
No. It applies to social housing (since 27 October 2025). The Renters' Rights Act 2025 lets the government extend it to private tenancies; it is in consultation until 18 December 2026 and no start date has been set. Your repair and fitness-for-habitation duties apply today.
What will the deadlines be?
The proposal is 24 hours for an emergency hazard, 10 working days to investigate a significant hazard, 3 working days for a written summary and 5 working days to make the home safe, with longer works started within 12 weeks. The final figures come in regulations.
Can a tenant take me to court over mould today?
Yes, under the fitness-for-human-habitation and repair sections of the Landlord and Tenant Act 1985, and the council can serve an improvement notice under the Housing Act 2004.
Does my agent carry the duty?
No. The landlord is liable. The consultation expects agency agreements to spell out who investigates, writes to the tenant and arranges the work within the deadlines.
Read next
Guide
What is the minimum EPC rating to let a home in England?
A home you let in England needs an EPC rated E or better, unless an exemption is on the PRS Exemptions Register. The planned rise to C from 1 October 2030 is government policy but still needs new law.
Guide
Landlord compliance checklist (England)
Every legal check for a private let in England in one list: gas, EICR, EPC, alarms, deposit, right to rent, the information sheet and the landlord database.
Guide
What can landlords be fined for in England? A checklist
Every penalty a private landlord in England can face, with the official maximum for each: the Renters' Rights Act's £7,000 and £40,000 civil penalties, rent repayment orders of up to two years' rent, deposits, fees, right to rent, gas, electrics, alarms, energy ratings and licensing. Maxima only, from GOV.UK and the legislation; councils set their own starting points.
Guide
Renters' Rights Act: what changed for landlords
The Renters' Rights Act came into force in England on 1 May 2026. Section 21 is gone, every tenancy is now periodic, and rent rises follow one procedure. Here is what a self-managing landlord actually has to do differently.
Templates, terms and news on this
Glossary
EICR codes: C1, C2, C3 and FI
The codes an electrician uses on an EICR: C1 danger present, C2 potentially dangerous, FI further investigation needed, C3 improvement recommended.
Glossary
Awaab's Law
Rules setting fixed times for landlords to investigate and fix damp, mould and other serious hazards. In force for social housing; due to be extended to private lets.
Glossary
Category 1 hazard
The most serious level of hazard under the HHSRS. When a council finds one in a home, it must take enforcement action.
Glossary
Decent Homes Standard
A standard a home must meet: free of serious hazards, in reasonable repair, with reasonably modern facilities and warm. Applies to social housing; planned for private lets.
Read enough? Upload a document to start.