Awaab's Law:業主處理潮濕及霉菌的責任及期限

Awaab's Law 訂明了調查及修復潮濕、霉菌及其他嚴重危害的固定時限。此法例自 2025 年 10 月 27 日起已適用於社會房屋。《租客權利法》(Renters' Rights Act)容許政府把此法例擴展至私人放租物業;諮詢期至 2026 年 12 月 18 日;目前未定開始日期。在此之前,你現有的維修及適居責任仍然適用。

簡而言之: 私人放租物業暫未適用,但時限的計算已經開始。Awaab's Law 自 2025 年 10 月 27 日起已適用於社會業主:緊急危害須於 24 小時內處理妥當,潮濕及霉菌等重大危害須於 10 個工作天內調查,調查結果須於 3 個工作天內以書面提交,而住所須於 5 個工作天內處理至安全。《2025 年租客權利法》(Renters' Rights Act 2025)第 60 條容許政府把同樣規定適用於私人租約;諮詢(2026 年 10 月 9 日至 12 月 18 日)建議採用相同時限;目前未定開始日期。現時,私人業主仍須履行《1985 年業主及租客法》(Landlord and Tenant Act 1985)的適居及維修責任,租客可向法院申請強制執行;地方議會亦可根據房屋健康及安全評級制度採取行動。

維修與居住標準(英文版)安全證書與物業(英文版)《租客權利法》(英文版)

英格蘭。 已於 2026 年 10 月 30 日 對照法律查核. 本網站內容為法律資訊,並非法律意見。

閱讀英文版本 · 機器翻譯

分享

Where Awaab's Law stands today

Social housing: in force. Since 27 October 2025 registered providers of social housing must act within fixed times on damp and mould and on every emergency hazard (phase 1). Phase 2, from 30 November 2026, adds excess cold and heat, falls, electrical hazards, fire, structural collapse and hygiene hazards. Phase 3, in 2027, adds the remaining hazards of the housing health and safety rating system (HHSRS), except overcrowding.

Private lets: not yet. Section 60 of the Renters' Rights Act 2025 rewrites section 10A of the Landlord and Tenant Act 1985 so that it can apply to a tenancy of a home in England of under seven years. That section is not in force yet, and the timescales come in regulations that have not been made. The government's consultation, Extending Awaab's Law to private rented tenancies and to licences, opened on 9 October 2026 and closes at 11:59pm on 18 December 2026. No start date has been set. It asks whether to bring it in by phases (damp, mould and emergency hazards first, as in social housing). Its impact assessment assumes three phases in 2028, 2029 and 2030; that is an analytical assumption, not a decision.

So: nothing new is required of a private landlord today, and no start date is set. What follows is what is proposed, so you can get ready, and what you already owe.

The timescales proposed for private lets

The consultation proposes the same clock as social housing, counted from the day you become aware of a potential hazard (that day is day zero):

StepProposed time
An emergency hazard (a serious and imminent risk): investigate and make safeas soon as practicable, and within 24 hours
Investigate a significant hazard such as damp and mouldwithin 10 working days
Give the tenant a written summary of what you found and what you will dowithin 3 working days of the investigation ending (not needed if all the work is already done)
Make the hazard safe (temporary measures count)within 5 working days of the investigation ending
Start preventative or longer workswithin 5 working days, or take steps to start and begin within 12 weeks
Alternative accommodation if the home cannot be made safe in timeasked about, not proposed firmly (the social-housing rule requires it)

The consultation also asks whether some of these should be shorter or longer (for example 12 or 48 hours for an emergency, 5 or 15 working days to investigate). Expect the final figures to be close to the table.

How it would be enforced

Awaab's Law works as an implied term of the tenancy. If a landlord misses a deadline the tenant can sue for breach of contract: a court can order the work, award compensation and some costs. The Pre-Action Protocol for Housing Conditions Claims applies first. Tenants would also be able to complain to the Private Rented Sector Landlord Ombudsman, which is expected from 2028 and can order action, an apology or compensation. Councils do not police the timescales themselves, but keep their HHSRS powers (improvement notices and the penalties behind them).

A landlord who uses an agent stays liable: the consultation says agency contracts may need to say who does what within the deadlines.

What a private landlord already owes

Awaab's Law is new; the duty to deal with damp and mould is not.

  • Fit for human habitation (Landlord and Tenant Act 1985, section 9A, from the Homes (Fitness for Human Habitation) Act 2018): the home must be fit at the start of the tenancy and stay fit. Damp, mould, cold and ventilation problems can make it unfit. The tenant can go to court for an order and compensation.
  • Repairs (section 11): the structure and exterior, and the installations for water, gas, electricity, sanitation, heating and hot water, are yours to keep in repair. Leaks, failed extractor fans and broken heating are repair duties, whatever the cause of the mould.
  • The council's HHSRS powers (Housing Act 2004): damp and mould is a hazard the council can inspect for and serve an improvement notice on; not complying is an offence with a civil penalty of up to £40,000 or prosecution, and a rent repayment order.
  • The Decent Homes Standard for private lets is coming under the Renters' Rights Act, with its own timing set by regulations after consultation.

Getting ready

  1. Answer every report in writing, with a date. Keep the tenant's message, your reply and photos on the home's record. The written summary within three working days is the step most landlords will miss.
  2. Inspect within ten working days, even for a small patch: a damp meter, the extractor fans, the trickle vents, the heating, any leak, and whether the mould is on a cold outside wall.
  3. Fix the cause, not only the stain. Condensation needs heating, ventilation and sometimes insulation; penetrating damp needs the gutter, roof or pointing; rising damp needs a survey. Advice to the tenant about drying clothes and opening windows can be part of the answer, never the whole of it.
  4. Have someone who can attend within 24 hours for an emergency: a leak through a light fitting, no heating in winter for a vulnerable tenant, a collapsing ceiling.
  5. Know when the home cannot be lived in and what you would offer: the social-housing rule is alternative accommodation, and the consultation asks whether private landlords should have the same duty.

LevelMoves keeps the report, your written reply, the inspection and the fix on the home's record, so the dates are there if anyone asks.

Scotland and Wales

This guide is about England. Scotland has made its own damp and mould regulations under its housing law; Wales has its own fitness standard. If you let there, check the rules that apply there.

資料來源

業主常見問題

Awaab's Law 現時適用於私人業主嗎?

不適用。此法例適用於社會房屋(自 2025 年 10 月 27 日起)。《2025 年租客權利法》容許政府把此法例擴展至私人租約;諮詢期至 2026 年 12 月 18 日,目前未定開始日期。你現時仍須履行維修及適合人類居住的責任。

時限會是甚麼?

建議為:緊急危害 24 小時內處理;重大危害 10 個工作天內調查;書面摘要 3 個工作天內提交;住所 5 個工作天內處理至安全;較長時間的工程須於 12 週內開始。最終數字將以規例訂定。

租客今天可以因霉菌起訴我嗎?

可以,依據《1985 年業主及租客法》中有關適合人類居住及維修的條文。地方議會亦可根據《2004 年房屋法》發出改善通知。

我的代理需要負責嗎?

不需要,責任在業主身上。諮詢預期代理協議會訂明,誰須在時限內負責調查、致函租客及安排工程。

法律動態電郵

英格蘭租務法例一有變動,我們就發一封簡短電郵,告訴你要做甚麼。不含廣告。

看完了?上傳文件,馬上開始。

物業 PA 會為你保存本指南提到的所有日期;涉及任何費用,都會先問你。